Prepare the bottom layer modules
With the provided plugs, reducer and sealing tape, fi t as shown. |
|
| Using a hacksaw or similar fi ne saw, remove the top of one only transfer spigot. |
 |
| Arrange the fi rst layer of Modtanks on a fi rm level base such as concrete pavers or slab. Allow a 25mm space from any wall. |
|
|
| Using 15mm/19mm threaded/barbed elbow and tees and barbed 19mm elbows and tees, join all the outlets as shown. When using 1”/25mm tees and elbows HR Products, HR-T10 G10M and HR-E10G10M catalogue gives the most clearance. |
|
| |
| |
Liquid thread sealant must be applied to elbows and tees that are fi tted directly into the tank. |
|
When using 1”/25mm tees and elbows there must be a 9mm clearance between the tee and the ground. |
|