Home   |   Warranty   |   Contact Us
Patent Application #2007905620
Modtank Logo
     
 

Step 1 - the base layer

Step 1 | Step 2 | Step 3

Downloads:
Printer Friendly Version of this page
Printer Friendly Version of whole instalation guide

Prepare the bottom layer modules

With the provided plugs, reducer and sealing tape, fi t as shown.

step 1 image 1
Using a hacksaw or similar fi ne saw, remove the top of one only transfer spigot. Step 1 - image 2
Arrange the fi rst layer of Modtanks on a fi rm level base such as concrete pavers or slab. Allow a 25mm space from any wall.  
Step 1 - image 3
Using 15mm/19mm threaded/barbed elbow and tees and barbed 19mm elbows and tees, join all the outlets as shown. When using 1”/25mm tees and elbows HR Products, HR-T10 G10M and HR-E10G10M catalogue gives the most clearance.
Step 1 - image 4
 
  Liquid thread sealant must be applied to elbows and tees that are fi tted directly into the tank.   When using 1”/25mm tees and elbows there must be a 9mm clearance between the tee and the ground.  
 
     
Home | Warranty | Water Cartage | StockistsBuy OnlineHome QuoteNews | Installation GuideTrade PortalContact Us